Mash Heating: 
Discrete HERMS
Mash Stirring: 
Manual
HLT Heating: 
Propane Burner
Electric Element
Boiler Heating: 
Propane Burner
Electric Element
Wort Chilling: 
Plate Chiller
Sparge Method: 
Fly
Tiers: 
1
Pumps: 
3
Portable: 
Could be transported
Plumbing Size: 
0.50
Plumbing Joinery: 
NPT
Compression
Soldered
Quick Disconnect
Hose Thread
Automation: 
Mash Temperature
Solenoid Valve Control
HLT Temperature
Burner Ignition
BK Heat
Clean-In-Place: 
CIP Plumbing
CIP Valve(s)
Availability: 
Not for sale
Detailed Notes: 
Current set-up consist of the brew structure, mill, 2 chamber fermentation room, three 50L keg, kegerator, and keg cleaning/sanitizing station.
Stuck Mash Prevention: 
Manual Flow Control
Build Cost: 
10000
Brewery Location: 
Cordoba, Cordoba - Argentina