The Drunken Parrot Brewery

Mash Heating: 
HLT-based HERMS
Mash Stirring: 
Motorized
HLT Heating: 
Electric Element
Boiler Heating: 
Electric Element
Wort Chilling: 
Plate Chiller
Sparge Method: 
Batch
Tiers: 
1
Pumps: 
1
Portable: 
Built-in
Plumbing Size: 
0.50
Plumbing Joinery: 
NPT
Compression
Tri-Clover
Quick Disconnect
Automation: 
Mash Temperature
Mash Level
HLT Temperature
HLT Level
HLT Stirring
BK Heat
BK Level
Valve
Pump
Mash Stirring
Clean-In-Place: 
All Stainless
CIP Plumbing
Automated CIP
Availability: 
Not for sale
Highlights: 
Brewtroller controlled
Stuck Mash Prevention: 
None
Build Cost: 
3500
Brewery Location: 
MN
Break Separator: 
BK Filter